Saturday May 13 Work Party

I’ve just been given the green light for the work party Saturday and the materials are ordered. We will be: Moving materials from the 50 yd shelter to the rear of the SRB, laying out and installing target frame pipes, building new target frames, and generally clean-up of both ranges. The tools we will need include: drill/drivers (torx bits), miter saws, table saws, circular saws, post hole diggers (powered and manual), pressure washers, surface cleaners for pressure washers, wheel barrows, leave blowers, and transfer shovels (flat edge).
So, bring your work gloves and work ethic, we’ve got a lot to do. See you Saturday at 9:30. Remember, the black flags stay out unless the work is completed!

Art Schoner
ASC MO