Urgent Work Party

There will be a (hopefully brief) work party Sunday afternoon (October 9th) at 2:30. The goal of this work party is to maintain the structural integrity of the 50-yard range shelter. We will be installing joist hangers on some of the joists in the overhead. We will also be removing some of the load (wood) stored in the overhead. We will need bottle jacks (and wood to adjust their height), 4×4 or larger post to jack the joists, come alongs with straps or chains, LARGE pipe wrenches (to twist the joists of necessary), and impact drivers with ¼ inch drivers. If you can help and can bring any of the items above, please let me know. Otherwise, I’ll have to acquire them. I can be reached at [email protected].

Thanks, and I hope to see you at the range!

Art Schoner
ASC XO

________________________________
Last Updated on 2 years by Art Schoner

Back to Top