Mother nature has decided to add 2 pools to our ranges. The SRB side wall will now double as a lifeguard stand!
Seriously, it got a little wet at the club yesterday. These pictures were taken at 1:45, in between bands of rain. You can see that 4 of the 6 layers of block are in place on the back wall of the SRB. MT2 is still processing the lead out of the soil. I haven’t heard from either contractor on when they think they’ll be able to return. I hope to get a realistic completion date later this week so I can plan the massive work party required to get our ranges back in operation. If you have a powered post hole digger, please let me know and include the size(s) auger you have for it as well.
Art Schoner
ASC MO